RF Micro Devices Fab III - Greensboro, NC
• Fast-track, 11-month construction groundbreaking to tool install
• 30,000 SF central plant
• 60 foot deep 100' x 100' waste treatment facility
• 4,370 SF Class 10 cleanroom, 930 SF Class 100 cleanroom,
__5,192 s/f Class 1000 cleanroom
• Raised access floor over recessed slab,
__14' W x 14' C utility tunnel
• Clear span 18' deep trusses over Fab
• Electron grade 1 DI water system 400 g.p.m.
• Full UPS and emergency generator back-up
• Semiconductor cleanroom
• Cleanroom construction general contractor
|