RF Micro Devices Fab III - Greensboro, NC

• Fast-track, 11-month construction groundbreaking to tool install

• 30,000 SF central plant

• 60 foot deep 100' x 100' waste treatment facility

• 4,370 SF Class 10 cleanroom, 930 SF Class 100 cleanroom,
__5,192 s/f Class 1000 cleanroom

• Raised access floor over recessed slab,
__14' W x 14' C utility tunnel

• Clear span 18' deep trusses over Fab

• Electron grade 1 DI water system 400 g.p.m.

• Full UPS and emergency generator back-up

• Semiconductor cleanroom

• Cleanroom construction general contractor