Raytheon ETL/SAT Com - Marlboro, MA
• Satellite Communications Integration & Operations Center
• 70,000 SF steel frame, two-story, Greenfield Project
• Electronic laboratories with heavy electric requirement
• Satellite mounted roof stations
• LEED Silver Level Award
• Structural steel, two-story
• Close controls for tie-ins
• Accommodate Humvee Lab bays
• Value engineering reduced original cost by half
• Site was solid rock and required blasting and ledge removal
• Building was positioned to optimize satellite dish trajectory
• Completed: September 2002
• Approximate Value: $11,593,830
|