|
Tiffany & Co. - Cumberland, RI
• Construction Management with Guaranteed Maximum Price (GMP)
• HCC value engineered site elevation to balance site
• Site includes 30" -0" cut to fill
• Masonry veneer exterior with pre-cast and block accents
• Epoxy floor throughout production and common spaces
• HCC procured and installed cleaning, pickling,
__and polishing lines
• HCC procured and installed DI water, waste treatment,
__and dust collection
• Facilitized and installed all production tools
• Lobby/rotunda including quality millwork display
|