Client: BAE Systems
Project: Microwave East Cleanroom Upgrade
Project Type: Cleanroom Upgrade
Industry: Defense Industry Cleanrooms
Project Highlights
- Size: 15,000 sf
- Demolished Class 100,000 cleanroom to turn into Class 10,000
- New rooftop units on new steel platforms
- New ductwork system for ducted supply and return
- HCC installed flooring, walls, ceiling system, HVAC piping HVAC ductwork
- Project on a plans and specification basis
- Construction Manager
- Value: $1,800,000
- Architect/Engineer: SPEC
Similar Hodess Projects
- Hodess' Cleanroom at GE Healthcare Achieves LEED Gold Certification
- General Electric Healthcare Digital X-Ray Detector Facility, East Greenbush, NY
- BAE Systems AIX HVPE Tool Install, Nashua, NH
- Teradyne TCO Cleanroom, Nashua, NH
- Millipore Mobius II, Danvers, MA
- National Semiconductor Building 18, Portland, ME
- Insight Technology, Londonderry, NH
- Matrix, East Providence, RI
- Brown University, Barrus & Holley Microelectronic Center, Providence, RI
- Fairchild Semiconductor, Portland, ME
- University of Rhode Island Center for Atmospheric Chemistry Studies, Narragansett, RI
- AmberWave, Salem, NH
- Ahura, Wilmington, MA
- Raytheon Anechoic Chamber, Andover, MA
- BAE Systems IR Common Build Phase II, Nashua, NH