Client: BAE Systems
Project: Microwave East Cleanroom Upgrade
Project Type: Cleanroom Upgrade
Industry: Defense Industry Cleanrooms
Project Highlights
- Size: 15,000 sf
- Demolished Class 100,000 cleanroom to turn into Class 10,000
- New rooftop units on new steel platforms
- New ductwork system for ducted supply and return
- HCC installed flooring, walls, ceiling system, HVAC piping HVAC ductwork
- Project on a plans and specification basis
- Construction Manager
- Value: $1,800,000
- Architect/Engineer: SPEC
Similar Hodess Projects
- BAE Systems AIX HVPE Tool Install, Nashua, NH
- SAFT, Jacksonville, FL
- Quantum Photonics, Columbia, MD
- Matrix, East Providence, RI
- Wyeth Pharmaceuticals, West Greenwich, RI
- Anadigics, Warren, NJ
- Brown University, Barrus & Holley Microelectronic Center, Providence, RI
- Insight Technology, Londonderry, NH
- Teradyne Northeast Blvd., Nashua, NH
- InfraReDX, Burlington, MA
- Vascular Technology, Nashua, NH
- Nortel (formerly Coretek), Wilmington, MA
- Filtrona Extrusion Cleanroom Expansion, Athol, MA
- Bandwidth Semiconductor, Hudson, NH
- Polytop Corporation, Slatersville, RI