Client: BAE Systems
Project: MEC Cleanroom
Project Type: Design/Build
Industry: Defense Industry Cleanrooms
Project Highlights
- Size: 33,000 sf
- 13,000 sf of new cleanroom; 7,000 sf Class 100 and 6,000 sf Class 1,000
- Greenfield expansion microelectronics facility
- New chillers for both new and existing facility
- Upgraded existing make-up air unit from 30,000 to 40,000 cfm
- HCC created a solution for BAE’s temperature and humidity requirements
- Installed all tools, process, electrical, gas monitoring, life safety waste treatment
- Value: $9,500,000
- Architect: Bay State Design
Similar Hodess Projects
- Axcelis CCS Manufacturing, Beverly, MA
- Ahura, Wilmington, MA
- Solasta, Newton, MA
- Rohm and Hass (formerly Shipley), Marlboro, MA
- Community Tissue Services, Kettering, OH
- General Electric R&D Cleanrooms, Niskayuna, NY
- Raytheon Saws Cleanroom, Andover, MA
- Scitex Digital Printing, Kettering, Ohio
- Wyeth Pharmaceuticals, West Greenwich, RI
- SVG Lithography, Multiple Projects, Ridgefield and Wilton, CT
- Raytheon Anechoic Chamber, Andover, MA
- Fuji Film Microelectronic Materials, Quonset, RI
- Tiffany & Co., Cumberland, RI
- Battelle Labs, Columbus, OH
- Unitrode Fab III, Merrimack, NH