Client: Bandwidth Semiconductor
Project: Design/Build Cleanroom
Project Type: Renovation/ Design/Build
Industry: Defense Industry Cleanrooms
Project Highlights
- Size: 10,000 sf
- 10,000 sf of cleanroom space Class 100 – 10,000
- Provided process piping including: clean dry air, process cooling water, process vacuum, wastewater treatment, DI water, nitrogen, hydrogen, high purity gas and scrubbed exhaust
- Metal stud partitions with Biowall panel
- Design/Build
- Value: $5,100,000
- Architect: H.L. Turner Group INC.
- Engineer: RDK
Similar Hodess Projects
- Fuji Film Microelectronic Materials, Quonset, RI
- Rohm and Hass (formerly Shipley), Marlboro, MA
- Ahura, Wilmington, MA
- University of Rhode Island Aquaculture Science Laboratory, Kingston, RI
- LG Chemical / Compact Power Inc., Holland, MI
- National Semiconductor Building 18, Portland, ME
- Raytheon Anechoic Chamber, Andover, MA
- Solasta, Newton, MA
- BAE Systems IR Common Build Phase I, Nashua, NH
- W.L. Gore, Elkton, MD
- BAE Systems IR Common Build Phase II, Nashua, NH
- Millipore Mobius II, Danvers, MA
- Matrix, East Providence, RI
- Insight Technology, Londonderry, NH
- General Electric R&D Cleanrooms, Niskayuna, NY