Client: Insight Technology
Project: PNVG Test and Assembly
Project Type: Design Build
Industry: Defense Industry
Project Highlights
- Second job for Insight Technology
- Design/Builder for 700sf of Class 100 cleanroom
- HCC purchased a modular plenum system consisting of five (5) 8 x 16 foot plenums and one (1) 4 x 16ft plenum from R.F. Micro Devices
- Plenum modules included a flush light grid for 100% HEPA coverage
- Laser curtains to break up the 704 sq ft of cleanroom under filter into mini laser testing rooms
- Retrofitted plenums with Gebhardt Fan Filter units
- Each plenum was then individually zoned
- 10 in chase along the perimeter walls running up to the plenum units
- Strict temperature and humidity control
- HCC added a new modular chiller outside on an existing pad with the capacity for future use.
- New piping, make up unit, humidifier and controls were added
- HCC provided all mechanical and design
- Critical 8 week deadline was met
- Value: $605,000
- Engineer: H.L. Turner
Similar Hodess Projects
- RF Micro Devices Packaging Prototype Lab, Greensboro, NC
- Medical Instill Filling Cleanroom, New Milford, CT
- AmberWave, Salem, NH
- Teradyne TCO Cleanroom, Nashua, NH
- Battelle Labs, Columbus, OH
- University of Rhode Island Aquaculture Science Laboratory, Kingston, RI
- Fairchild Semiconductor, Portland, ME
- Quantum Photonics, Columbia, MD
- Fuji Film Microelectronic Materials, Quonset, RI
- Axcelis Corporation Wafer 2000, Beverly, MA
- Wyeth Pharmaceuticals, West Greenwich, RI
- General Electric Healthcare Digital X-Ray Detector Facility, East Greenbush, NY
- Raytheon Saws Cleanroom, Andover, MA
- Unitrode Fab II Phase I, Merrimack, NH
- Millipore Mobius II, Danvers, MA