Client: Raytheon
Project: Anechoic Chamber
Project Type: Design/Build
Industry: Defense Industry Cleanrooms
Project Highlights
- Excavate and pour new 5’-0” thick inertia pad under entire room
- Construct 25’- H x 50’- L x 25’- W Anechoic Chamber
- Install two-1/2 ton cranes
- Design/Build HVAC systems
- Provide new controls
- Completed: October 2006
- Approximate Cost: $2,000,000
- Architect: H.L. Turner
Similar Hodess Projects
- University of Connecticut School of Engineering, Storrs, CT
- RF Micro Devices Fab II Phase I, Greensboro, NC
- University of Rhode Island Center for Atmospheric Chemistry Studies, Narragansett, RI
- BAE System Microelectronic Center for Excellence, Nashua, NH
- National Semiconductor Building 18, Portland, ME
- Anadigics, Warren, NJ
- Axcel Photonics, Marlboro, MA
- Test Project
- Polytop Corporation, Slatersville, RI
- Teradyne TCO Cleanroom, Nashua, NH
- Millipore Mobius II, Danvers, MA
- Axcelis Corporation Wafer 2000, Beverly, MA
- Ahura, Wilmington, MA
- Medical Instill Filling Cleanroom, New Milford, CT
- BAE Systems IR Common Build Phase II, Nashua, NH