Client: Raytheon
Project: ETL SAT Com
Project Type: Design/Build
Industry: Defense Industry Cleanrooms
Project Highlights
- 70,000 SF steel frame, two-story, Greenfield Project
- Satellite Communications Integration & Operations Center
- Electronic laboratories with heavy electric requirement
- Satellite mounted roof stations
- LEED Silver Level Award
- Structural steel, two-story
- Close controls for tie-ins
- Accommodate Humvee Lab bays
- Value engineering reduced original cost by half
- Site was solid rock and required blasting and ledge removal
- Building was positioned to optimize satellite dish trajectory
- Completed: September 2002
- Approximate Value: $11,593,830
- Construction Manager
- Architect: Bay State Design
- Engineer: RG Vanderweil
Similar Hodess Projects
- Battelle Labs, Columbus, OH
- Medical Instill Filling Cleanroom, New Milford, CT
- Raytheon Anechoic Chamber, Andover, MA
- BAE System Microelectronic Center for Excellence, Nashua, NH
- Digital Equipment Corp, Andover Chip and Wire Area, Hudson, MA
- RF Micro Devices Packaging Prototype Lab, Greensboro, NC
- Fuji Film Microelectronic Materials, Quonset, RI
- University of Rhode Island Aquaculture Science Laboratory, Kingston, RI
- RF Micro Devices Fab II Phase I, Greensboro, NC
- General Electric R&D Cleanrooms, Niskayuna, NY
- BAE Systems IR Common Build Phase II, Nashua, NH
- Wyeth Pharmaceuticals, West Greenwich, RI
- Nortel (formerly Coretek) MOCVD, Wilmington, MA
- Ahura, Wilmington, MA
- Millipore Mobius II, Danvers, MA