Client: Filtrona Extrusion
Project: Cleanroom Expansion
Project Type: Design/Build
Industry: Medical Device Cleanrooms
Project Highlights
- 10,000 SF of new space in existing warehouse
- 7,000 SF Class 100,000 cleanroom
- Industrial/pharmaceutical cleanrooms
- Design/Build new HVAC, electric
- Relocate and install process equipment from another plant
- HCC cleanroom contractor
- Design/Build office expansion/addition 1,800sf
- Completion schedule: November 2007
- For pharmaceutical grade tubing
- New structural steel to support cleanroom ceiling, ductwork, mechanical, electrical and process piping
- Ran new 1800 amp sub panel off existing gear
- Isopropyl alcohol exhaust system off a water based scrubber
- New chiller to feed new make-up unit and recirculation units
- Approximate Cost: $2,200,000
- Design/Build
- Architect: SMRT
Similar Hodess Projects
- Ahura, Wilmington, MA
- General Electric Healthcare Digital X-Ray Detector Facility, East Greenbush, NY
- Teradyne Composite Cleanroom, Nashua, NH
- Rohm and Hass (formerly Shipley), Marlboro, MA
- RF Micro Devices Fab II Phase I, Greensboro, NC
- BAE Systems IR Common Build Phase II, Nashua, NH
- BAE Systems AIX HVPE Tool Install, Nashua, NH
- BAE System Microelectronic Center for Excellence, Nashua, NH
- Solasta, Newton, MA
- Axcel Photonics, Marlboro, MA
- Raytheon Saws Cleanroom, Andover, MA
- Fuji Film Microelectronic Materials, Quonset, RI
- Digital Equipment Corp. Fab 4 Annex Phase 1-3, Hudson, MA
- Bandwidth Semiconductor, Hudson, NH
- Nortel (formerly Coretek) MOCVD, Wilmington, MA