Client: Filtrona Extrusion
Project: Cleanroom Expansion
Project Type: Design/Build
Industry: Medical Device Cleanrooms
Project Highlights
- 10,000 SF of new space in existing warehouse
- 7,000 SF Class 100,000 cleanroom
- Industrial/pharmaceutical cleanrooms
- Design/Build new HVAC, electric
- Relocate and install process equipment from another plant
- HCC cleanroom contractor
- Design/Build office expansion/addition 1,800sf
- Completion schedule: November 2007
- For pharmaceutical grade tubing
- New structural steel to support cleanroom ceiling, ductwork, mechanical, electrical and process piping
- Ran new 1800 amp sub panel off existing gear
- Isopropyl alcohol exhaust system off a water based scrubber
- New chiller to feed new make-up unit and recirculation units
- Approximate Cost: $2,200,000
- Design/Build
- Architect: SMRT
Similar Hodess Projects
- RF Micro Devices Fab III, Greensboro, NC
- University of Connecticut School of Engineering, Storrs, CT
- Raytheon ETL SAT Com, Marlboro, MA
- BAE Microwave East Cleanroom Upgrade, Nashua, NH
- Digital Equipment Corp. Fab 4 Annex Phase 1-3, Hudson, MA
- SAFT, Jacksonville, FL
- Drytek, Wilmington, MA
- National Semiconductor Building 18, Portland, ME
- Collagen Matrix, Franklin Lakes, NJ
- University of Rhode Island Aquaculture Science Laboratory, Kingston, RI
- Polytop Corporation, Slatersville, RI
- RF Micro Devices Fab II Phase I, Greensboro, NC
- Fuji Film Microelectronic Materials, Quonset, RI
- Stocker Yale, Salem, NH
- BAE Systems AIX HVPE Tool Install, Nashua, NH