Client: Millstone
Project: Medical
Project Type: Renovation
Industry:
Project Highlights
- Size: 23,000 sf
- 18,000 sf of clean manufacturing and 5,000 sf of Class 10,000 cleanroom
- HCC designed and installed a modular unistrut grid system to support T-5 lighting and wire mold wireways, compressed air and water drops
- HCC installed seamless sheet vinyl flooring, modular cleanroom panels at the perimeter, 1 ½” aluminum grid ceiling with vinyl faced tile
- Value: $2,100,000
- Design/Build
- Engineer: Buconjic P.E.
Similar Hodess Projects
- Solasta, Newton, MA
- National Semiconductor Building 18, Portland, ME
- Brown University, Barrus & Holley Microelectronic Center, Providence, RI
- General Electric Healthcare Digital X-Ray Detector Facility, East Greenbush, NY
- University of Connecticut School of Engineering, Storrs, CT
- RF Micro Devices Fab II Phase I, Greensboro, NC
- Test Project
- BAE Systems IR Common Build Phase II, Nashua, NH
- BAE Systems IR Common Build Phase I, Nashua, NH
- BAE Microwave East Cleanroom Upgrade, Nashua, NH
- Raytheon ETL SAT Com, Marlboro, MA
- Nortel (formerly Coretek) MOCVD, Wilmington, MA
- Axcelis Corporation Wafer 2000, Beverly, MA
- Raytheon Anechoic Chamber, Andover, MA
- Axcelis CCS Manufacturing, Beverly, MA