Client: Digital Equipment Corporation
Project: Andover Chip and Wire Area
Project Type: Construction Manager
Industry: Microelectronic Cleanrooms
Project Highlights
- Size: 5,000 sf
- Relocated 5,000 sf of Class 1,000 manufacturing from Andover, MA to Hudson, MA
- Included four new custom built vaneaxial fans and a walk on custom built plenum system
- Supply side of plenum created underneath using a 2” gel seal system with aluminum pans, gel sealed filters and gel sealed lights
- Room included static dissipative flooring and return walls were ½” honeycomb aluminum panel
- Process, electrical and wire mold for telephone and data were carried on racks installed on floor
- HCC disconnected, rigged, moved, restarted and reconnected all of the owners equipment
- Value: $1,350,000
- Construction Manager
- In-house Digital design
Similar Hodess Projects
- Axcelis Corporation Wafer 2000, Beverly, MA
- Wyeth Pharmaceuticals, West Greenwich, RI
- Axcelis CCS Manufacturing, Beverly, MA
- Polytop Corporation, Slatersville, RI
- Brown University, Barrus & Holley Microelectronic Center, Providence, RI
- Medical Instill Filling Cleanroom, New Milford, CT
- Quantum Photonics, Columbia, MD
- Stocker Yale, Salem, NH
- Insight Technology, Londonderry, NH
- Filtrona Extrusion Cleanroom Expansion, Athol, MA
- Bandwidth Semiconductor, Hudson, NH
- Brown University Metcalf Labs, Providence, RI
- Teradyne Northeast Blvd., Nashua, NH
- RF Micro Devices Fab III, Greensboro, NC
- Digital Equipment Corp. Fab 4 Annex Phase 1-3, Hudson, MA