Client: Nortel
Project: Wilmington, MA
Project Type: Microelectronic Cleanrooms
Industry: Research and Development
Project Highlights
- Size: 10,000 sf
- Class 100 to Class 100,000 cleanrooms
- Manufacturing of photonic materials
- Biowall on metal stud system
- HCC provided all air-handling, chillers, boilers, pump
- HCC installed all compressed air, DI water, waste treatment, process vacuum and process cooling systems
- New chiller on a new steel platform
- Value: $1,800,000
- Design/Build
- Designer: Lloyd Architects
Similar Hodess Projects
- Quantum Photonics, Columbia, MD
- National Semiconductor Building 18, Portland, ME
- Axcelis CCS Manufacturing, Beverly, MA
- Scitex Digital Printing, Kettering, Ohio
- SVG Lithography, Multiple Projects, Ridgefield and Wilton, CT
- Test Project
- BAE Microwave East Cleanroom Upgrade, Nashua, NH
- Medical Instill Filling Cleanroom, New Milford, CT
- RF Micro Devices Packaging Prototype Lab, Greensboro, NC
- Polytop Corporation, Slatersville, RI
- Unitrode Fab II Phase I, Merrimack, NH
- Digital Equipment Corp, Andover Chip and Wire Area, Hudson, MA
- Millipore Mobius II, Danvers, MA
- Vascular Technology, Nashua, NH
- General Electric Healthcare Digital X-Ray Detector Facility, East Greenbush, NY