Client: R.F. Micro Devices
Project: Fab III
Project Type: New Construction
Industry: Microelectronic Cleanrooms
Project Highlights
- 30,000 SF central plant
- 60 foot deep 100' x 100' waste treatment facility
- 4,370 SF Class 10 cleanroom, 930 SF Class 100 cleanroom, 5,192 s/f Class 1000 cleanroom
- Fast-track, 11-month construction groundbreaking to tool install
- Raised access floor over recessed slab, 14' W x 14' C utility tunnel
- Clear span 18' deep trusses over Fab
- Electron grade 1 DI water system 400 g.p.m.
- Full UPS and emergency generator back-up
- Semiconductor cleanroom
- Cleanroom construction general contractor
- Included separate utilities building which included chillers, boilers, vacuum pumps and compressed our systems
- Waste treatment for acid, solvent and arsenic waste
- Complete construction of a Greenfield cleanroom facility
- Construction Manager
- Designer: Lockwood Greene
Similar Hodess Projects
- Ahura, Wilmington, MA
- RF Micro Devices Fab II Phase I, Greensboro, NC
- Brown University Metcalf Labs, Providence, RI
- Scitex Digital Printing, Kettering, Ohio
- Nortel (formerly Coretek), Wilmington, MA
- Raytheon ETL SAT Com, Marlboro, MA
- University of Rhode Island Aquaculture Science Laboratory, Kingston, RI
- Tiffany & Co., Cumberland, RI
- Fuji Film Microelectronic Materials, Quonset, RI
- Drytek, Wilmington, MA
- Wyeth Pharmaceuticals, West Greenwich, RI
- BAE Systems IR Common Build Phase II, Nashua, NH
- Teradyne TCO Cleanroom, Nashua, NH
- Millipore Mobius II, Danvers, MA
- Digital Equipment Corp. Fab 4 Annex Phase 1-3, Hudson, MA