Client: Battelle Labs
Project: Laboratories
Project Type: Design/Build
Industry: Clean Laboratories
Project Highlights
- Size: 6,500 sf
- Class 100 and Class 10,000 cleanrooms
- Class 100 was created with modular walls and fan plenums
- Class 10,00 was made with modular walls with 2” ceiling grid and fan filters
- New make-up air and exhaust systems, high purity process, plumbing and electrical
- Facility for MEMS processing at the submicron level
- Included photolithography, etching, deposition testing and packaging
- Value: $2,600,000
- Designer: R.G. Vanderweil
Similar Hodess Projects
- BAE Systems IR Common Build Phase I, Nashua, NH
- Scitex Digital Printing, Kettering, Ohio
- Raytheon ETL SAT Com, Marlboro, MA
- RF Micro Devices Fab III, Greensboro, NC
- AmberWave, Salem, NH
- Unitrode Fab III, Merrimack, NH
- University of Rhode Island Aquaculture Science Laboratory, Kingston, RI
- Brown University, Barrus & Holley Microelectronic Center, Providence, RI
- BAE Systems AIX HVPE Tool Install, Nashua, NH
- National Semiconductor Building 18, Portland, ME
- Digital Equipment Corp. Fab 4 Annex Phase 1-3, Hudson, MA
- Millstone Medical, New Bedford, MA
- Nortel (formerly Coretek), Wilmington, MA
- Teradyne Composite Cleanroom, Nashua, NH
- Stocker Yale, Salem, NH