Client: Digital Equipment Corporation
Project: Fab 4 Annex, Phase 1-3
Project Type: Design/Build
Industry: Microelectronic Cleanrooms
Project Highlights
- Size: 3,000 sf
- (3) 1,000 sf Class 1 @ .12 micron cleanroom bays
- Included nickel chrome raised access floor, ½” modular and 2” honeycomb aluminum wall panels, gel seal 2” t-bar grid with 100% ULPA coverage
- Also included custom built modular vaneaxial recirculation fans
- Installed a custom 30,000 cfm make-up air unit and a new 20,000 cfm scrubbed exhaust system
- Acid exhaust system was installed using fire rated FRP ductwork
- Hodess also hooked up all tools
- Designer: Advance D-Zign
Similar Hodess Projects
- BAE Microwave East Cleanroom Upgrade, Nashua, NH
- Raytheon Anechoic Chamber, Andover, MA
- Brown University Metcalf Labs, Providence, RI
- Scitex Digital Printing, Kettering, Ohio
- Polytop Corporation, Slatersville, RI
- Anadigics, Warren, NJ
- Nortel (formerly Coretek) MOCVD, Wilmington, MA
- Quantum Photonics, Columbia, MD
- Ahura, Wilmington, MA
- Teradyne Northeast Blvd., Nashua, NH
- Matrix, East Providence, RI
- Raytheon ETL SAT Com, Marlboro, MA
- General Electric Healthcare Digital X-Ray Detector Facility, East Greenbush, NY
- BAE Systems AIX HVPE Tool Install, Nashua, NH
- Collagen Matrix, Franklin Lakes, NJ