Client: Drytek
Project: Cleanroom construction
Project Type: Renovation
Industry: Microelectronic Cleanroom
Project Highlights
- Size: 10,000 sf
- 1,000 sf and 3,000 sf of Class 1,000 cleanroom
- Created a 3’ depression for a raised access floor and return air
- Provided value engineering solution by extending the depression and creating a butt glazed glass return wall to allow air to return to the plenum
- Then created a conference room that could look into the cleanroom
- Value: $750,000
- Construction Manager
- Design: Parsons
Similar Hodess Projects
- National Semiconductor Building 18, Portland, ME
- General Electric R&D Cleanrooms, Niskayuna, NY
- BAE System Microelectronic Center for Excellence, Nashua, NH
- BAE Systems IR Common Build Phase I, Nashua, NH
- Teradyne Northeast Blvd., Nashua, NH
- Wyeth Pharmaceuticals, West Greenwich, RI
- Medical Instill Filling Cleanroom, New Milford, CT
- Axcelis Corporation Wafer 2000, Beverly, MA
- Ahura, Wilmington, MA
- Nortel (formerly Coretek) MOCVD, Wilmington, MA
- Unitrode Fab II Phase I, Merrimack, NH
- Brown University, Barrus & Holley Microelectronic Center, Providence, RI
- Anadigics, Warren, NJ
- RF Micro Devices Fab III, Greensboro, NC
- SVG Lithography, Multiple Projects, Ridgefield and Wilton, CT