Client: Fairchild Semiconductor
Project: Design/Build and Renovation
Project Type: Design/Build
Industry: Microelectronic Cleanrooms
Project Highlights
- Design/Build new production facility
- 15,000 SF three-story fabrication building
- Addition on existing building
- Steel frame with precast walls
- Rubber roof
- 3 story addition that connects to existing building
- Aluminum grate raised access flooring, modular aluminum wall panel, flush light gel seal ceiling with 100% ULPA filters
- 160 tool and equipment relocations
- Features Class 1 cleanroom area
- Semiconductor cleanroom
- Upgraded: chilled water, acid neutralization, waste treatment, scrubbed exhaust, deionized water, process chemical and gas distribution systems
- No interruptions to existing production facility
- Completed: December 2001
- Approximate Value: $9,367,000
- Architect: SMRT
Similar Hodess Projects
- Digital Equipment Corp. Fab 4 Annex Phase 1-3, Hudson, MA
- Ahura, Wilmington, MA
- National Semiconductor Building 18, Portland, ME
- Solasta, Newton, MA
- University of Rhode Island Aquaculture Science Laboratory, Kingston, RI
- Nortel (formerly Coretek), Wilmington, MA
- Matrix, East Providence, RI
- University of Rhode Island Center for Atmospheric Chemistry Studies, Narragansett, RI
- Battelle Labs, Columbus, OH
- BAE Systems AIX HVPE Tool Install, Nashua, NH
- Brown University, Barrus & Holley Microelectronic Center, Providence, RI
- Tiffany & Co., Cumberland, RI
- Raytheon ETL SAT Com, Marlboro, MA
- Digital Equipment Corp, Andover Chip and Wire Area, Hudson, MA
- Teradyne Northeast Blvd., Nashua, NH