Client: GE Energy
Project: Screen Print Cleanroom
Project Type: Design/Build Cleanroom
Industry: Lead Acid Batteries
Project Highlights
- 800sf of Class 10,000 Cleanroom
- Screen Print cleanroom for their new lead acid battery facility
- Installed cleanroom in crucial 6 week period
- HCC supplied all HVAC equipment including humidifier, make-up air unit and split system air conditioner
- HCC furnished and installed Neslo wall panels for exterior and interior walls, Gordon grid and Envirco fan filter units
- Plenum supply and return air delivery system
- HCC also made final exhaust and power connections to GE’s equipment
- Value: $360,000
- Architect/Engineer: SMRT
Similar Hodess Projects
- W.L. Gore, Elkton, MD
- Teradyne TCO Cleanroom, Nashua, NH
- AmberWave, Salem, NH
- Fairchild Semiconductor, Portland, ME
- Scitex Digital Printing, Kettering, Ohio
- University of Maryland, LPS Cleanroom, Baltimore, Maryland
- Axcelis Corporation Wafer 2000, Beverly, MA
- Unitrode Fab II Phase I, Merrimack, NH
- Teradyne Composite Cleanroom, Nashua, NH
- Rohm and Hass (formerly Shipley), Marlboro, MA
- Digital Equipment Corp. Fab 4 Annex Phase 1-3, Hudson, MA
- Vascular Technology, Nashua, NH
- Raytheon Anechoic Chamber, Andover, MA
- Nortel (formerly Coretek), Wilmington, MA
- Digital Equipment Corp, Andover Chip and Wire Area, Hudson, MA