Client: Polytop Corporation
Project: Cleanroom Design and Construction
Project Type: Design/Build
Industry: Medical Device Cleanrooms
Project Highlights
- 6,000 SF of Class 100,000 cleanroom
- 2,500 SF of warehouse mezzanine
- Walls were Biowall and metal studs covered with gypsum and fiberglass
- New mechanical building with 300 ton cooled water chiller
- Industrial cleanroom
- 18ft ceiling height with low profile overhead crane
- New steel superstructure to carry piping and mechanical
- Epoxy floors
- Gowning room and airlock
- Conveyor system
- Completed: 1998
- Approximate Value: $800,000
Similar Hodess Projects
- Solasta, Newton, MA
- Nortel (formerly Coretek) MOCVD, Wilmington, MA
- Fairchild Semiconductor, Portland, ME
- Hodess' Cleanroom at GE Healthcare Achieves LEED Gold Certification
- Millstone Medical, New Bedford, MA
- BAE Systems IR Common Build Phase I, Nashua, NH
- Brown University, Barrus & Holley Microelectronic Center, Providence, RI
- Quantum Photonics, Columbia, MD
- General Electric Healthcare Digital X-Ray Detector Facility, East Greenbush, NY
- Axcelis CCS Manufacturing, Beverly, MA
- National Semiconductor Building 18, Portland, ME
- Bandwidth Semiconductor, Hudson, NH
- Insight Technology, Londonderry, NH
- Axcelis Corporation Wafer 2000, Beverly, MA
- General Electric R&D Cleanrooms, Niskayuna, NY