Client: Quantum Photonics
Project: Design/Build of Manufacturing/Office Space
Project Type: Design/Build
Industry: Microelectronic Cleanrooms
Project Highlights
- Fit out of 30,000 SF of office & support space
- 7,500 SF of Class 100, 1000, and 10,000 Cleanroom
- Design/Build cleanroom manufacturing/office space
- Microelectronics Cleanroom
- Modular 2” aluminum wall system with gasketed aluminum ceiling grid and raised access floor
- Ran all process and hooked up tools
- Central chilled water plant for latent and sensible cooling, process cooling
- Central steam boiler for preheat, reheat and humidification
- High purity stainless piping for nitrogen and specialty gases
- Segregated gas bunker for pyrophorics, corrosives, acids and solvent storage
- New 18 Megohm DI water system and high purity PVDF piping
- -50° dewpoint clean dry air system
- Two stage acid neutralization system
- -20” Wg process vacuum system
- Completed: October 2001
- Approximate Value: $7,138,675
Similar Hodess Projects
- Test Project
- BAE Microwave East Cleanroom Upgrade, Nashua, NH
- Hodess' Cleanroom at GE Healthcare Achieves LEED Gold Certification
- Axcel Photonics, Marlboro, MA
- Raytheon ETL SAT Com, Marlboro, MA
- BAE Systems AIX HVPE Tool Install, Nashua, NH
- University of Rhode Island Center for Atmospheric Chemistry Studies, Narragansett, RI
- Battelle Labs, Columbus, OH
- Digital Equipment Corp, Andover Chip and Wire Area, Hudson, MA
- RF Micro Devices Packaging Prototype Lab, Greensboro, NC
- Stocker Yale, Salem, NH
- Unitrode Fab III, Merrimack, NH
- Fairchild Semiconductor, Portland, ME
- AmberWave, Salem, NH
- Anadigics, Warren, NJ