Client: R.F. Micro Devices
Project: Fab II Phase I
Project Type: New Construction
Industry: Research and Development
Project Highlights
- Size: 40,000 sf
- 20,000 sf of cleanroom from Class 100 – Class 10,000
- 10,000 sf of lab and 10,000 sf of mechanical/electrical support space
- Structural steel mezzanine above the entire cleanroom area
- Supplied recirculation units, 1,000 KW emergency generator and 2 400-ton chillers
- Fast track 20 week project
- Value: $13,400,000
- Construction Manager
- Designer: CRB
Similar Hodess Projects
- University of Connecticut School of Engineering, Storrs, CT
- Crawford Memorial Hospital 797 Pharmacy Suite , Robinson, Illinois
- BAE Systems IR Common Build Phase II, Nashua, NH
- SAFT, Jacksonville, FL
- Unitrode Fab III, Merrimack, NH
- Medical Instill Filling Cleanroom, New Milford, CT
- Fuji Film Microelectronic Materials, Quonset, RI
- Filtrona Extrusion Cleanroom Expansion, Athol, MA
- Digital Equipment Corp, Andover Chip and Wire Area, Hudson, MA
- Teradyne TCO Cleanroom, Nashua, NH
- Digital Equipment Corp. Fab 4 Annex Phase 1-3, Hudson, MA
- Polytop Corporation, Slatersville, RI
- General Electric Healthcare Digital X-Ray Detector Facility, East Greenbush, NY
- RF Micro Devices Fab III, Greensboro, NC
- Drytek, Wilmington, MA