Client: SVG Lithography
Project: Multiple Projects
Project Type: Design/Build
Industry: Microelectronic Cleanrooms
Project Highlights
- HCC completed 4 projects for SVG
- Sizes ranged from 36,000 sf to 200,000 sf
- Values ranged from $3,500,000 to $21,800,000 million
- Projects included laboratory space, Class 100 through Class 100,000 cleanroom
- All projects were design/build facilities
- Most projects included new electrical, mechanical, control and process systems
- Designer: Bay State Design
Similar Hodess Projects
- Raytheon Anechoic Chamber, Andover, MA
- Axcelis CCS Manufacturing, Beverly, MA
- University of Rhode Island Center for Atmospheric Chemistry Studies, Narragansett, RI
- Digital Equipment Corp. Fab 4 Annex Phase 1-3, Hudson, MA
- Fairchild Semiconductor, Portland, ME
- Vascular Technology, Nashua, NH
- BAE Microwave East Cleanroom Upgrade, Nashua, NH
- RF Micro Devices Fab III, Greensboro, NC
- Nortel (formerly Coretek), Wilmington, MA
- Anadigics, Warren, NJ
- Rohm and Hass (formerly Shipley), Marlboro, MA
- Polyclad Corporation, Franklin, NH
- General Electric Healthcare Digital X-Ray Detector Facility, East Greenbush, NY
- Raytheon ETL SAT Com, Marlboro, MA
- BAE Systems IR Common Build Phase I, Nashua, NH