Client: Teradyne
Project: Composite Cleanroom
Project Type: Renovation
Industry: Microelectronic Cleanrooms
Project Highlights
- Size: 5,000 sf
- 2,500 sf of Class 10,000 cleanroom
- Removal of old concrete slab to create new depressed slab area
- New raised access floor installed
- New make-up air and recirculation systems installed
- New waste treatment pit was installed
- Room required tight temperature and humidity control
- Value: $1,000,000
- Architect: H.L. Turner and R.D.K. Engineers
Similar Hodess Projects
- Unitrode Fab II Phase I, Merrimack, NH
- Community Tissue Services, Kettering, OH
- Battelle Labs, Columbus, OH
- Stocker Yale, Salem, NH
- BAE Systems IR Common Build Phase II, Nashua, NH
- AmberWave, Salem, NH
- Raytheon ETL SAT Com, Marlboro, MA
- Filtrona Extrusion Cleanroom Expansion, Athol, MA
- BAE System Microelectronic Center for Excellence, Nashua, NH
- Insight Technology, Londonderry, NH
- Fairchild Semiconductor, Portland, ME
- Millipore Mobius II, Danvers, MA
- Bandwidth Semiconductor, Hudson, NH
- SVG Lithography, Multiple Projects, Ridgefield and Wilton, CT
- University of Rhode Island Aquaculture Science Laboratory, Kingston, RI