Client: Tiffany & Co
Project: Construction
Project Type: Construction Management
Industry:
Project Highlights
- Construction Management with Guaranteed Maximum Price (GMP)
- HCC value engineered site elevation to balance site
- Site includes 30" -0" cut to fill
- Masonry veneer exterior with pre-cast and block accents
- Epoxy floor throughout production and common spaces
- HCC procured and installed cleaning, pickling, and polishing lines
- HCC procured and installed DI water, waste treatment, and dust collection
- Facilitized and installed all production tools
- Lobby/rotunda including quality millwork display
Similar Hodess Projects
- Brown University, Barrus & Holley Microelectronic Center, Providence, RI
- University of Rhode Island Center for Atmospheric Chemistry Studies, Narragansett, RI
- Rohm and Hass (formerly Shipley), Marlboro, MA
- Battelle Labs, Columbus, OH
- Raytheon Saws Cleanroom, Andover, MA
- Nortel (formerly Coretek), Wilmington, MA
- Unitrode Fab III, Merrimack, NH
- Matrix, East Providence, RI
- RF Micro Devices Fab II Phase I, Greensboro, NC
- Teradyne TCO Cleanroom, Nashua, NH
- Quantum Photonics, Columbia, MD
- Digital Equipment Corp, Andover Chip and Wire Area, Hudson, MA
- Teradyne Composite Cleanroom, Nashua, NH
- Unitrode Fab II Phase I, Merrimack, NH
- Test Project