Client: Unitrode
Project: Fab II Phase I
Project Type:
Industry: Microelectronic Cleanrooms
Project Highlights
- Size: 15,000 sf
- 4,000 sf of Class 10 and 4,000 sf of Class 10,000
- HCC designed and constructed the entire building including concrete slab, structural steel frame, metal panel exterior and rubber roof
- HCC provided recirculation units for all 4 cleanroom bays using Vaneaxial Fans with regain silencer
- Purchased make-up air units, chillers, cooling tower, DI water system, compressed air system and acid waste treatment from another a similar facility that was closing
- HCC provided bulk nitrogen, new electrical, new scrubbed exhaust, solvent exhaust and heat exhaust systems
- Fab included seamless vinyl floors, metal stud chase walls with laminate cleanroom wall panels and a rod hung 2” grid system for the ceiling
- Designed as a ducted supply, plenum return cleanroom
- Value: $ 5,000,000
- Engineers: Am-Tech
- Architect: Lloyd Architects
Similar Hodess Projects
- BAE Systems AIX HVPE Tool Install, Nashua, NH
- Anadigics, Warren, NJ
- Solasta, Newton, MA
- General Electric Healthcare Digital X-Ray Detector Facility, East Greenbush, NY
- Brown University Metcalf Labs, Providence, RI
- Collagen Matrix, Franklin Lakes, NJ
- Test Project
- RF Micro Devices Packaging Prototype Lab, Greensboro, NC
- Polyclad Corporation, Franklin, NH
- RF Micro Devices Fab III, Greensboro, NC
- BAE Systems IR Common Build Phase I, Nashua, NH
- Polytop Corporation, Slatersville, RI
- Unitrode Fab III, Merrimack, NH
- Wyeth Pharmaceuticals, West Greenwich, RI
- Filtrona Extrusion Cleanroom Expansion, Athol, MA