Client: GE Healthcare
Project: Digital X-Ray Detector Facility
Project Type: Construction Manager
Industry: Biotechnology
Project Highlights
- Size: 56,000 sf
- Completed the cleanroom envelope of 40,000 sf of Class 100, and 16,000sf of Class 10,000 and 100,000
- Included an aluminum raised access floor in a 3’ depressed area and over a 16’ wide utility tunnel
- Customized floor so that cleanroom bays had a conductive perforated tile while the chases had grated floor tile
- Also included a flush light gel seal ceiling system with 100% ULPA coverage and modular aluminum honeycomb ¼” and 2” wall panel
- Class 10,000 and Class 100,000 used a 2” cleanroom ceiling grid with vinyl face gypsum tiles, seamless vinyl floors and epoxy coated perimeter partitions
- This area had a ducted return and supply and was isolated from the Class 100 air stream.
- Hodess also received a separate contract to perform the tool installation and hook-up
- LEED Certified
- Value: $9,000,000
- Construction Manager
- Architect: H.L. Turner
- Engineer: SMRT
Similar Hodess Projects
- Millstone Medical, New Bedford, MA
- RF Micro Devices Fab II Phase I, Greensboro, NC
- Medical Instill Filling Cleanroom, New Milford, CT
- University of Rhode Island Center for Atmospheric Chemistry Studies, Narragansett, RI
- Raytheon Saws Cleanroom, Andover, MA
- Nortel (formerly Coretek), Wilmington, MA
- National Semiconductor Building 18, Portland, ME
- Polytop Corporation, Slatersville, RI
- RF Micro Devices Fab III, Greensboro, NC
- Anadigics, Warren, NJ
- Digital Equipment Corp, Andover Chip and Wire Area, Hudson, MA
- SVG Lithography, Multiple Projects, Ridgefield and Wilton, CT
- Tiffany & Co., Cumberland, RI
- Unitrode Fab II Phase I, Merrimack, NH
- Solasta, Newton, MA