Client: University of Connecticut
Project: School of Engineering
Project Type:
Industry:
Project Highlights
- Size: 150,000 sf
- New updated computer, electronic and destructive testing laboratories and classrooms
- Destructive testing wing included 4 foot thick concrete slab or “strong floor”
- Wing also included a 25- ton bridge crane with columns and rails for the movement of materials
- Labs included laboratory casework and future hoods and the utilities and exhausts
- Value: $8,549,165
- Construction Manager
Similar Hodess Projects
- BAE Systems IR Common Build Phase II, Nashua, NH
- Digital Equipment Corp. Fab 4 Annex Phase 1-3, Hudson, MA
- Community Tissue Services, Kettering, OH
- Ahura, Wilmington, MA
- Filtrona Extrusion Cleanroom Expansion, Athol, MA
- Raytheon ETL SAT Com, Marlboro, MA
- Teradyne Northeast Blvd., Nashua, NH
- AmberWave, Salem, NH
- Rohm and Hass (formerly Shipley), Marlboro, MA
- RF Micro Devices Fab III, Greensboro, NC
- BAE Microwave East Cleanroom Upgrade, Nashua, NH
- RF Micro Devices Fab II Phase I, Greensboro, NC
- Battelle Labs, Columbus, OH
- Bandwidth Semiconductor, Hudson, NH
- Test Project